Installation & adjustment
1. Seller will send 1-2 technicians to guide the equipment installation and trial run.
2. The installation duration is about 10 days.
3. Buyer should pay the service fee of $80 each day per person for seller’s technicians. Buyer should pay the round trip ticket and board & lodging for seller’s technicians in buyer’s country.
4. The necessary conditions such as workshop, illumination and ventilation etc.
5. The construction of machine’s foundation support steel blocks.
6. The boiler and pipes & valves connected to the inlets/outlets of machine.
7. Hydraulic oil, thermal oil and fuel for boiler.
8. The necessary device, facilities and skilled worker for the installation and trial run.
9. Electric power, connected to main electric cabinet;
10. The necessary material such as impregnated paper, raw board etc.
11. The other relevant tools for the installation and trial run.